1 of 19 PART 1 – GENERAL 1.01 The design standards outlined in this Section apply to all wastewater lift stations within the The design pumping capability of the station shall be based upon the peak design flow, which Wet Well Structure Type precast precast cast-in-place or precast 3 Piping (below or above
Learn MoreCustomer Service Orders: (800) 447-3408. Customer Support: (800) 447-3408. Local Florida (386) 873-4123 Local Oregon (541) 476-6605. Business Hours E-mail & Phone Numbers Address & Directions Policy for Aircraft & Avionics Sales Policy for Radio Control Sales
Learn Morepart d - pumping stations 73 d1 introduction 74 d2 scope 74 d3 definitions 74 d4 general 74 d5 provision of pumping stations 75 d6 rising mains 83 d7 design of pumping stations 85 part e - civil engineering specification 95 e1 general 97 e2 materials 98 e3 excavation and backfilling 115 e4 formwork and concrete 117
Learn MoreSubmersible Lift Station with Standby Power Section 11200 - 1 SECTION 11200 SMALL SUBMERSIBLE SEWAGE LIFT STATION PART 1 - GENERAL 1.01 GENERAL DESCRIPTION Contractor shall provide all labor, equipment, and materials necessary to construct a raw sewage lift (pump) station in accordance with the Small Sewage Lift Station Guidelines, the Standard
Learn More3.3.1 The various types of such foundations are as under: a) Machine foundations 1) Reciprocating type - See IS :‘2974 ( Part 1 )-1982**. 2) Impact type - See IS : 2974 ( Part 2 )-1980tt. *Code of practice for design and construction of pile foundations : Part 1 Concrete
Learn More1. 01 2004-1 Rev. D - Concrete Standards General Outline and Reinforcement Notes 2. 01 2004-2 Rev. D - Concrete Standards General Outline and Reinforcement Notes 3. 01 2005 Rev. B - Standard Designs Sitework Typical Water Crossing 4. 01 8000 Rev. B - Design Standards Unified Soil Classification 5. 31 0001-1 Rev.
Learn MoreFORWARD 1 PART 1 - SUBMISSION OF PLANS 2 1 1.0 GENERAL 2 3 1.1.9 Proposed Treatment Processes 2 4 1.1.11 Automation 2 4 1.1.15 Plant Capacity 3 PART 2 - GENERAL DESIGN CONSIDERATIONS 4 8 2.2d Building Drainage 4 8 2.2e Dehumidification 4 9 2.2k Sanitation Facilities 4 9 2.21 Ladders, Stairs 4
Learn MoreReading time: 1 minuteDifferent types of concrete are produced based on the constituent material, mix design, the method of construction, area of application, form of hydration reaction. Details of these various types of concrete, their properties and applications are discussed. Contents:23 Types of Concrete and Their Applications1. Normal Strength Concrete2. Plain Concrete3. Reinforced
Learn MoreAll concrete lids must be purchased and picked up from our Flemington, New Jersey plant. 29" dia. Concrete Replacement Lid (Fits 24" dia. Risers) (29-CONLID) PDF | CAD. 35" dia. Concrete Replacement Lid (Fits 30" dia. Risers) (35-CONLID) PDF | CAD. View fullsize. Large Square Replacement Lid (16" x 16" x 3", tapers up to 20" x 20") (LGSQST-LID
Learn MorePART 1 - UTILITY STANDARDS SECTION 1.1 SITE DEVELOPMENT STANDARDS This section 1.1 contains general standards for the construction of infrastructure in Manatee County. Subsequent sections contain more detailed standards. All improvements shall be subject to all the
Learn Moreresponsibility for the design and construction of levees. 3. Distribution. This manual is approved for public release; distribution is unlimited. 4. General. This manual is intended as a guide for designing and constructing levees and not intended to replace the judgment of the design engineer on a particular project. FOR THE COMMANDER: RUSSELL
Learn MorePART 1: GENERAL 1.01 SCOPE At a minimum, the pump station lot shall include a 40’ X 40’ fenced area, and an additional 5’ of property outside the entire .02 STATION DESIGN 1. The lift station shall have a 100% reserve peak pumping capacity (dual pumps) and, at a minimum, be capable of pumping at a
Learn More3.10 pump stations and force mains 02530-52 3.11 pipe design life 02530-61 3.12 cleanup and restoration of site 02530-61 02630 - storm drainage part 1 - general 1.1 related documents 02630-1 1.2 summary 02630-1 1.3 definitions 02630-1 1.4 submittals 02630-2 1.5 quality assurance 02630-2
Learn Moresewage pumping stations i. general information and requirements, invitation, proposal and contract documents general information and requirements invitation for bids proposal contract contract bond labor and material bond ii. general conditions paragraph section 1 definitions of terms
Learn MoreTwo Notes: (1) Hilti KB-TZ2 may be directly substituted for TZ in this detail.(2) If the exterior, on-grade transformer is "unimportant (i.e., Ip = 1.0 per ASCE 7)" and being installed as part of a new- or existing-building project in which the seismic design of the building is based on SDC C, compliance with the slab/anchorage shown on Std
Learn MoreCity of Memphis, TN 01010 - 1 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL 1.01 LOCATION OF WORK A. The work of this Contract is located at the T.E. Maxson Wastewater Treatment Facility (Maxson WWTF), located at 2685 Steam Plant Road, Memphis, TN. 1.02 SCOPE OF WORK A.
Learn MorePART I 64E-6.001 General. (1) The provisions of Part I (64E-6.001 - 6.016) of this chapter shall apply to all areas of the state except where specific provisions in Part II (64E-6.017 - 6.0182), addressing the Florida Keys, or specific provisions in Part IV (64E-6.025 - 6.0295),
Learn MoreUnified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.
Learn MoreFeb 24, · 2.2 PRECAST CONCRETE MANHOLES, AIR RELEASE MANHOLES, AND BYPASS PUMPING VAULTS A. General: 1. Precast manholes shall conform to the details shown on the Standard Details. 2. Concrete shall be minimum 4000 psi compressive strength. 3. Except where otherwise specified precast manhole components shall
Learn More11021-1 PART 1 GENERAL 1.01 SCOPE A. Description of Work 1. Provide all labor, material and equipment to remove the existing self-contained, cast iron sluice gate from the existing partition wall in the wet well of the Ridge Street Pump Station and furnish and install stainless
Learn MorePART 1 - GENERAL. 1.1 SECTION SUMMARY. A.Work covered by this document includes design, engineering, labor, material and products, equipment warranty and system warranty, training and services for, and incidental to, the complete installation of new and fully operating National Fire Protection Association (NFPA) – Life Safety Code 101.3-2 (a
Learn MorePART 1 GENERAL 1.1 REFERENCES 1.2 DEFINITIONS 1.3 SUBMITTALS 1.4 MODIFICATION OF REFERENCES 1.5 DELIVERY, STORAGE, AND HANDLING 1.5.1 Reinforcement 1.5.1.1 Epoxy Coated Reinforcing Steel 1.6 QUALITY ASSURANCE 1.6.1 Design Data 1.6.1.1 Formwork Calculations 1.6.1.2 Concrete Mix Design 1.6.2 Shop Drawings 1.6.2.1 Formwork
Learn MoreWebsite Directions. (225) 361-8429. 12379 Greenwell Springs Rd. Baton Rouge, LA 70814. From Business: Since our beginnings in 1972, we have installed over ten thousand home improvement projects and continue to bring you Superior service. Call us for a free. 3. Peterson Concrete Tank Co.
Learn MoreYour SpCC plan must describe how your tank design and operations com-ply with these requirements (see Chapter 1, Environmental and Emergency Response Planning). 4.2.1.2 Mobile or Portable Containers Mobile or portable storage containers, such as 55-gallon drums, skid tanks, totes,
Learn More01.110. Technical product documentation — Data fields in title blocks and document headers. Technical product documentation — Design for manufacturing, assembling, disassembling and end-of-life processing — Part 1: General concepts and requirements.
Learn MoreAddendum Plantsville Pump Station Rehabilitation Southington, CT Item 1-6 Drawing M-101 - Pump Station Plan and Section Change the two labels of the hatch hinges to the opposite side of the hatches. Clarification Item 1-7 Drawing D-101 - Demolition and Existing Conditions Site Plan